Photos

Keyword: Category: Tag: Sort By:
The last installed I-beam completes the shell of the new 175th Wing Headquarters, Mission Support Group and Medical Group facility at Warfield Air National Guard Base, Baltimore, Md. February 28, 2013. This new construction has a projected cost $11.8 million, and features multiple green roofs and is anticipated to achieve certified LEED Silver status with the numerous energy enhancement measures upon its completion. Functional areas include offices, medical/dental examination and treatment space, classrooms, administration space, command section, conference rooms, telephone switching/data automation center as well as utility systems services and connections. (National Guard photo by Senior Master Sgt. Ed Bard)


Topping off ceremony

The last installed I-beam completes the shell of the new 175th Wing Headquarters, Mission Support Group and Medical Group facility at Warfield Air National Guard Base, Baltimore, Md. February 28, 2013. This new construction has a projected cost $11.8 million, and features multiple green roofs and is anticipated to achieve certified LEED Silver status with the numerous energy enhancement measures upon its completion. Functional areas include offices, medical/dental examination and treatment space, classrooms, administration space, command section, conference rooms, telephone switching/data automation center as well as utility systems services and connections. (National Guard photo by Senior Master Sgt. Ed Bard)

Related Imagery
Senior Master Sgt. Ed Bard
130228-F-JZ005-314.JPG

DOWNLOAD PHOTO
(1.56 MB)



Tags
facilities, Home Station



< Back to Main Gallery